October 08, 2012

The Gestalt of a Railroad



On a recent Acela ride to Boston I tried to explain to a seat-mate why our high speed train was alternately crawling along at 45 miles per hour in Metro-North territory, then screaming northward at 125 beyond New Haven.  I told him (a visitor from Switzerland used to amazing rail service) that a railroad is a great example of “gestalt”… that the whole is greater than the sum of its parts.
THE TRAIN:           We focus a lot on the age and capabilities of our rail engines and passenger cars in defining a railroad.  Sure, Acela is the fastest train in North America, running an average 125 mph in many areas between Washington and Boston.  But it is capable of much higher speeds, recently being tested at 165 mph in nighttime runs in New Jersey.  Even Metro-North’s old cars, let alone the new M8’s, can easily cruise at 90 mph.  I say “can” because they are capable of those speeds. But there are too many other components of a railroad that often make such speeds undesirable for comfort or safety.
THE TRACK:          Even Acela has a hard time in Connecticut because of old track and a century old right-of-way.  (Think of running a Lamborghini on a pot-holed local road.)
The track must be strong enough to support heavy trains.  In most places, track is welded for a smooth ride, avoiding the clickety-clack sound as trains ride over the joints.
The track sits on and is attached to a base plate which in turn sits on a tie, or sleeper.  For centuries these ties have been made of treated wood, but increasingly are built with concrete.  The ties sit on a roadbed or ballast, usually crushed stone, which distributes the weight of the train above while still allowing drainage. All of this requires maintenance and regular replacement of worn ties and rail to keep a smooth ride.
This is why even Metro-North’s newest cars bounce and creak as they ride along.  The rough ride isn’t the fault of the train but the roadbed.
And because our “right of way” follows the coastline, our tracks curve and bank as they meander along, causing further slowdowns just for the physics of the run.  The line from NYC to Boston has so many curves that a train makes the equivalent of six complete circles on that route.
THE SIGNALS:           Even the fastest trains in the world running on the newest and smoothest roadbed can’t keep up speed without knowing that the track ahead is clear.  And at 125 to 250 mph (US and world-class definitions of High Speed Rail), that requires a signal system that knows the location of every train within a matter of inches.
Like our century-old right-of-way, the ancient signal system on Metro-North is what’s preventing us from running trains at faster speeds and shorter headways (the time or distance between trains).
All US railroads are also struggling to meet a 2015 Federal mandate of “positive train control”, meaning that a train that runs through a red signal would be automatically stopped.  
THE  POWER:        Whether Metro-North or Amtrak, our trains need power which comes in the form of electricity pulled from overhead wire, or catenary, some of which is almost a century old.  The railroad and CDOT are midway through a 30-year, multi-million dollar plan to update all of that wiring while still running a full complement of trains each day.  It’s like trying to change a fan-belt on a moving car.
So the next time you’re riding the train, give thought to the many components that make for a smooth, comfortable, speedy and safe trip.  The whole is truly more than the sum of its parts.

September 24, 2012

Good News About Metro-North



So often this column is a screed of complaints about Metro-North.  This time, the good news, because I really think in the last year we have turned the corner in everyone’s goals and hopes for making Metro-North service better.
MORE SEATS:       The latest monthly reports reviewed by the CT Rail Commuter Council show that 99% of all trains have enough cars.  That’s a major improvement compared to a few years ago when “consist compliance” was in the 85% range (i.e. 15% of all trains didn’t have enough cars for the passenger load they usually carried).   Why the improvement?  The new M8 cars.
NEW CARS:           The new M8 cars continue to arrive at the rate of about ten new cars a month, an aggressive delivery schedule few thought Kawasaki could ever achieve.  On average, each car is going 139,000 miles before it has a problem.  That’s an MDBF (mean distance between failure) twice as good as the M4 and M6 cars.  So far 128 new M8’s are in service, meaning you have about a 30% chance of riding in a new-car train at rush hour and a 50% chance on weekends.
RIDERSHIP:           Despite the economy, ridership continues to climb about 5% annually.  The biggest increase?  Weekend day trippers.
ON TIME:               This has always been a justifiable point of pride with Metro-North, as 97% of the trains arrive “on time” (within 6 minutes of the timetable).
NEW SIGNALS:      The signalization system being installed on the Danbury branch continues apace with one of the first sections to be activated within a month.  When it’s completed this will mean more trains, in both directions, on this one-track railroad.
NEW SERVICE:      With the new October timetable there will be added service on weekends… eight more trains on Saturdays and 20 more trains on Sundays.
MORE STOPS:       Thanks to years of persuasion by The CT Rail Commuter Council to the CDOT, that new timetable will also eliminate the old “skip stops” at less used stations like Rowayton, East Norwalk, Greens Farms and Southport.  Now, instead of trains every two hours, those stations… in fact, all stations… will have train service every hour.  The brief added time for these stops will hardly be noticed but will offer vastly improved service to hundreds of daily riders.
QUIET CARS:         It took about a decade of lobbying by the CT Rail Commuter Council, but since Metro-North initiated the “Quiet CALMute” cars a few months ago, they’ve been a big success.
BETTER COMMUNICATIONS:    By cell phone, e-mail, PA system and ‘seat-drops’, the railroad is doing a much better job of communicating with its passengers on the rare occasions when things go wrong.
THE PASSENGER PLEDGE:      Though not quite the “Passenger Bill of Rights” that the CT Rail Commuter Council had crafted, this first-time-ever written pledge to passengers about the kind of service they deserve and can expect was a major step by Metro-North.
But wait, there’s more!   There are further enhancements being considered by the railroad:
WI-FI:           Testing continues, but we could be seeing on-train Wi-Fi accessibility in a matter of months, not years.
SMARTPHONE TICKETS: Yes, you’ll soon be able to buy a ticket on your phone, show it to the conductor, and never have to handle paper.
So, for those of you who think that all I do is moan and complain, re-read everything above and let’s both give credit where it is due.  Good job Metro-North!

September 10, 2012

The Bridgeport - Port Jefferson Ferry



Every now and then it’s great to see a transportation system that works really well.  Case in point, the Bridgeport (CT) to Port Jefferson (NY) ferry.
I’ve written in the past about some folks’ crazy idea that ferry boats are the solution to our traffic problems along I-95.  They are not.  But they do prove useful when they take you where the roads and rails can’t, like across Long Island Sound.
The first ferry ran this 18-mile route in 1872.  By 1883 permanent service was offered by a company owned in part by Bridgeport’s PT Barnum (after whom one of the line’s current vessels is named).  In 1980 all-season service began with the line’s largest vessel, “The Grand Republic”.
The Bridgeport & Port Jefferson Steamboat Company is 100% owned by Brian McAllister, a fourth generation seaman and tugboat czar who lives on Long Island.  You’ll usually see one of his tugs in Port Jeff’s harbor.
Each of the line’s three ferries is “RO-RO”, for roll-on, roll-off.  At Bridgeport, cars and trucks drive on from the rear and exit in Port Jefferson by driving off thru the raised bow of the vessel.  The ferries can carry between 90 and 110 vehicles and a thousand passengers.
The crossing takes about an hour and a quarter but you can save considerable time, tolls and aggravation by avoiding driving to New York City and crossing the Whitestone or Throgs Neck bridges.
When it began, the ferries carried food grown on Long Island to industrial cities in New England.  Today you’ll still see an occasional truck ferrying seafood, but most of the traffic is tourists and business people.
In season, all three vessels are in operation allowing for almost hourly departures.  If you’re bringing a vehicle a reservation is a good idea, though on most weekday runs you can just drive right up and catch the next boat.
The vehicle unloading and re-loading process is smooth and when passengers leave their cars they can join foot passengers upstairs at the snack bar or cocktail lounge.  In good weather the sundeck affords a wonderful view.  There’s Wi-Fi available onboard and cell-phone signals are strong, even in the middle of the Sound.
In Bridgeport, the ferry dock is a two-minute walk from Metro-North.  But in Port Jefferson it’s about a 25-minute walk from the dock to the nearest Long Island Railroad station.  Taxi service is available at both terminals.
Fares aren’t cheap:  $54 for a car and driver, $15 for each additional passenger.  Foot passengers are $18 one-way, $26 for same-day roundtrip.  Seniors (age 60+) are $13 one-way, $18 for a same-day return.  Kids 12 and under are always free when traveling with an adult.
There was talk a few years ago of offering additional service from New Haven to Port Jeff.  More recently there was discussion of also running to Stamford and from there to NYC using a high speed ferry, but rising fuels costs sunk those plans.
The current ferries are hardly high speed… just 17 mph according to my GPS on a recent crossing.  But they’re a fun way to travel, avoiding the traffic mayhem of New York City when going from Connecticut to Long Island.

August 27, 2012

Metro-North’s Ticket Rules Are a Rip-off


Metro-North’s “new and improved” fare policy taking effect on September 4th is neither new nor improved.  It continues to be a rip-off of riders.
Until 2010, you could buy a one-way or round-trip ticket and use it anytime within 90 days.  Convenient ten trip tickets were good for a year.  And unused tickets could be refunded anytime for free.
Then, in December of 2010, things changed for the worse:  one-way tickets were only good for 14 days and ten-trips for six months.  Refund any ticket and you’d be hit with a $10 service fee.
Why the change?  Metro-North admitted it wasn’t able to collect all tickets on trains and was losing money.  So rather than staff trains with enough conductors to collect tickets, they thought it wiser to penalize passengers.
How did these faster-expiring tickets hurt?  In many ways:
Some passengers who bought ten trip tickets for occasional trips found they’d expired, leaving them with four or five unused rides costing $10 or more apiece.  Ouch!
That was a mistake you’d only make once, so those passengers then abandoned the 30 – 40% savings of ten-trip tickets and had to buy one-ways.  Ka-ching!
That means many passengers must buy a new ticket before every trip, which means getting to the station early and standing in line. 
But while passengers were inconvenienced and lost money under the new rules, Metro-North scored a windfall of millions of dollars in additional revenue… some of it, perhaps, from previously uncollected tickets, but how much more from tickets bought in good faith but unused because they had expired?
And $10 to refund a ticket?  By whose accounting?  The same agent who handles refunds doesn’t charge $10 to sell a ticket, so why charge for a refund?
The Commuter Council representing LIRR riders has a better idea:  tickets sold could not be refunded, but neither would they expire.
This September 4th, responding to “massive complaints” from riders, the rules will change, but only slightly:  one-way and roundtrip tickets will then be good for 60 days, not 14.  But ten trips are still worthless after six months.
To my thinking, tickets should never expire.  If there’s a fare increase, pay the difference between the old fare and the new one.  Otherwise, if you’ve paid for a ticket, you can take the ride. Period.
Conductors should do their jobs, placing seat-checks when tickets are collected so they know when new passengers get aboard and can then collect their tickets.  How often have you seen a conductor walk through a train crying, “Stamford tickets,” as the newly boarded commuters avoid eye contact?
Watching someone board at Stamford who doesn’t pay their fare is like watching someone shoplift.  We all pay for their theft.
The new M8 cars mean more seats and fewer standees.  It’s a rare Friday afternoon train that’s packed so tight a conductor can’t move through to collect tickets.  If you ride a train where fares aren’t collected you should report it.  A well paid Metro-North conductor hiding in their booth from angry passengers instead of collecting their fares is unacceptable.
We already pay the highest commuter rail fares in the US.  These unfair Metro-North ticket rules just make commuting less convenient and more expensive.

August 13, 2012

Amtrak's Future in Connecticut


Amtrak, what passes for America’s national railroad, has some big plans for the future.  The problem is finding any consensus, let alone the money, on what those plans should be.
Before we detail their vision for the year 2030, here’s a snapshot of how Amtrak operates today.  Amtrak runs 46 trains a day through Connecticut serving 1.7 million passengers annually.  New Haven, the busiest station in the state, is also the 11th busiest in the nation.
Amtrak’s flagship, Acela, running from Boston to Washington, also stops in Stamford (and once-a-day in New London), while the slower “Northeast Corridor” trains serve Bridgeport, Old Saybrook and Mystic with branch-line trains running from New Haven to Hartford and Springfield.
Amtrak is also hired by the CDOT to run Shore Line East commuter trains between New London and New Haven.
Unlike the rest of the Northeast Corridor, Amtrak does not own or control the tracks from the New York state line to New Haven.  Those tracks are owned by the CDOT which pays Metro-North to maintain them and the overhead power (catenary) lines.  Amtrak pays a flat fee (far too low, says CDOT) to run its trains on “our” tracks, plus a little bonus money to the state for prioritizing its schedule over that of the commuter lines.
Connecticut’s section of the Northeast Corridor contains more miles and serves more stations than any other state from D.C. to Massachusetts.  And it includes several 100+ year-old bridges crossing the Thames, Niantic and Connecticut Rivers, crucial to inter-city service.  It’s old and expensive to maintain.
It’s hard to run a true high speed railroad on a century-old right-of-way.  In fact, Acela goes no faster than Metro-North (90 mph) between NY and New Haven and cannot engage its tilting mechanism on the many curves.
So, as Amtrak looks to the future, it’s thinking of building an entirely new line through Connecticut to connect New York City and Boston.  Rather than following the coastline (parallel to I-95) it envisions an inland route (parallel to I-84).
As the last phase of its 2030 – 2040 “Next Gen” high speed rail, 220 mph Amtrak bullet-trains (faster than the current French TGV) would bypass Stamford, New Haven and New London and instead zip through Danbury, Waterbury and Hartford.  “Super-Express” service would be non-stop thru Connecticut while “Express” trains would make brief stops in those inland Connecticut cities.  Northeast Corridor service would continue along the coast as either “Shoreline Express” or “Regional” trains.
Needless to say, Governor Malloy and the CDOT are not happy with Amtrak’s plan, especially given Connecticut (and the Feds’) investment in the New Haven to Hartford high(er) speed corridor.  They want the existing coastal corridor to New Haven to be served by the super-Acela service which could then continue north through Hartford to Springfield before heading east to Boston.  Put the trains where the people are, is their argument.
Amtrak thinks the coastal corridor is too old, has too many curves and would be too expensive to operate.  They think it would be cheaper to build a new line from scratch, and they’re probably right.
We are so lucky that, a century ago, a four-track rail line was built along Connecticut’s coast.  It was state-of-the-art for its time and could never be built today.  But for the 21st century, this line is obsolete.  Every serious high speed railroad in the world operates on a new, dedicated right-of-way, not some hand-me-down from the past.
So, good for Amtrak for bold planning for our future.  It’s time for our Governor and CDOT to get on board.  A new, inland high-speed route is the best way to go.

THE MUSEUM THAT OWNS ITS OWN RAILROAD

Happy 30 th birthday to the largest railroad museum in Connecticut, the Railroad Museum of New England in Thomaston. It was in 1996 that...