April 24, 2018

"Getting There" - Second Guessing the CDOT

Years ago a US official touring China’s amazing new 225-mph high speed rail network commented: “It’s amazing what you can do in a country that only needs three people to make a decision”.  No public hearings, no environmental impact studies… no dissent.

In this country we have a different system.  Consider CDOT’s many multi-million dollar projects, their public process and, as a result, how slowly they progress.

The “billion dollar” Walk railroad bridge replacement in South Norwalk is a perfect example.

The CDOT deserves a lot of credit for their transparency on this project, including a  dozen or so open houses, information forums and public hearings they have held. They’ve even opened a walk-in information center nearby.  There are weekly updates and a robust website, in multiple languages, to keep Norwalkers updated on the nine-year project.  

Nobody can say the public isn’t involved.

The project has been brewing since 2015, but only now are the protests really ramping up in the form of a lawsuit.  At issue is whether replacement of the swing bridge is really necessary or whether a fixed (unmovable) bridge would suffice.

Plaintiffs say that a fixed-bridge wasn’t considered, but should have been, even if it meant getting the Norwalk River upstream officially closed by act of Congress after buying out the local marinas and oil terminals that might lose barge service as a result.

But the CDOT says that option was cost-analyzed and would only save 11% of the construction cost, while still disrupting the area and the demolition of the Aquarium’s IMAX theater.

I’m not a lawyer (or an engineer), so I can’t opine on either the legality or engineering decisions.  But that hasn’t stopped others from questioning the CDOT at this late point in the process.  Everyone seems to have an opinion, whatever their qualifications.

Some are even waxing nostalgic about the Victorian-era look of the bridge, hoping its iron superstructure could be preserved or replicated, because it is such a part of the city’s identity. Maybe the city’s motto should be “Norwalk:  We live in the past.”

But where were these people three years ago when the project was in its development phase?  How much work (time and money) might be lost if their litigious second-guessing further stalls this crucial project?

Remember:  this bridge is being replaced because it is used by 200 daily trains carrying 125,000 passengers on Amtrak and Metro-North.  There’s a lot at stake if it isn’t fixed.

Another case in point: the Cribari Bridge over the Saugatuck River in Westport built in 1884.  This swing bridge carries vehicular traffic on Rt 136 but is so old and crumbling that CDOT recently put a 20-ton weight restriction on the span.  That means fire trucks can’t get across.  But the town and CDOT have been battling for years over replacing the Cribari bridge. 

Preservationists want to keep its ornamental steel truss filigree even though it’s regularly struck by traffic.  It’s another battle of nostalgia over practicality.

I’m all for citizen engagement in transportation planning.  But at some point we have to trust the professionals, yes… the engineers, to do the right thing and build for the future.  The time for kibitzing should have a statute of limitations.

Our crumbling infrastructure cannot wait to be rebuilt.

Posted with permission of Hearst CT Media.


No comments:

THE GRANDMOTHER WHO SAVED OUR TRAINS

Jodi Rell saved our trains.  There is no Governor in recent decades who did more for rail commuters than she did.  Governor Jodi Rell Gove...